Publications

2011 PUBLICATIONS

International Journal Articles

 

Akpınar, S., Bayhan, G.M. (2011). A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints. Engineering Applications of Artificial Intelligence, Vol. 24(3), pp. 449-457.

Baykasoğlu, A., Göçken, T. (2011). Solving fully fuzzy mathematical programming model of EOQ problem with a direct approach based on fuzzy ranking and PSO. Journal of Intelligent & Fuzzy Systems, 22(5), 237-251.

Baykasoğlu, A., Kaplanoğlu, V., Erol, R., Şahin, C. (2011). A multi-agent framework for load consolidation in logistics. TRANSPORT, 26(3), 320-328.

Baykasoğlu, A., Kaplanoğlu, V. (2011). A multi-agent approach to load consolidation in transportation. Advances in Engineering Software, 42(7), 477-490.

Dereli, T., Baykasoglu, A., Durmusoglu, A., Durmusoglu, Z.D.U. (2011). Enhancing technology clustering through heuristics by using patent counts. Expert Systems with Applications, 38(12), 15383-15391.

Elmi A., Solimanpur, M., Topaloglu, S., & Elmi A. (2011). A simulated-annealing algortihm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Computers & Industrial Engineering, 61 (1), 171-178.

Ertay, T., Akyol, D.E., Araz, C. (2011). An Integrated Fuzzy Approach for Determining Engineering Characteristics in Concrete Industry. Applied Artificial Intelligence, 24(4), 305-327.

Hamzadayi, A. & Yildiz, G. (2012). “A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints.” Computers & Industrial Engineering, 62(1), 206-215.

Selim, H., Selim S., Eroğlu S. (2011). Uluslararası bir imalat firmasında müşteri memnuniyetini belirleyen faktörlerin analizi. Journal of the Faculty of Engineering and Architecture of Gazi University (ISI) , Cilt 26(3), pp. 561-573.

Subulan, K., Cakmakci, M. (2011). A feasibility study using simulation-based optimization and Taguchi experimental design method for material handling—transfer system in the automobile industry. International Journal of Advanced Manufacturing Technology, DOI: 10.1007/s00170-011-3514-0.

Topaloglu, S., & Ozkarahan, I. (2011). A constraint programming-based solution approach for medical resident scheduling problem. Computers & Operations Research, 38(1), 246-255.

Tuncel, G. (2012). An integrated modeling approach for shop-floor scheduling and control problem of flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology, DOI 10.1007/s00170-011-3560-7 (article in press).

Turker, A. K., Sel, C. (2011). Scheduling Two Parallel Machines with Sequence-dependent Setups and A Single Server. Gazi University Journal of Science, 24(1) ,113 – 123.

Turker, A. K., Sel, C. (2011),  A Hybrit Approach on Single Server Parallel Machines Scheduling Problem with Sequence Dependent Setup Times. Journal of the Faculty of Engineering and Architecture of Gazi University, 26(4), 731-740.

Yalçınkaya, Ö., Bayhan, G.M. (2012). A feasible timetable generator simulation modelling framework for train scheduling problem. Simulation Modelling Practice and Theory, 20, 1, 124-141.

 

National Journal Articles

 

Baykasoğlu, A., Dereli, T., Altun, K. (2011). Kullanılmış tır çekici seçimi: pratik bir karar destek yaklaşımı EVEN-SWAP. Lojistik, 19, 18-22.

Sarac, T., Ozsoydan, F.B. (2011). A Discrete Particle Swarm Optimization Algorithm for Bi-Criteria Warehouse Location Problem. Special Issue of 12th International Symposium on Econommetrics, Operation Research and Statistics.

 

Books and Book Chapters

 

Bilgen, B. (2011). Possibilistic mixed integer linear programming approach for production allocation and distribution supply chain network problem in the consumer goods industry, p.505-525, Supply Chain Coordination under Uncertainty, Choi, Tsan-Ming; Cheng, T.C. Edwin (Eds.), Springer.

 

International Conference Proceedings

 

Akpınar, S.,Hamzadayı, A., Elmi, A.. Minimization of Total Tardiness on Unrelated Parallel Machines via Simulated Annealing. 4th International Conference of Iranian Operations Research Society, Rasht, Iran, May 2011.

Akyol, D.E., De Koster, R.. Aligning City Municipality and Retailer Objectives Using Time Access Windows.International Logistics and Supply Chain Congress, Izmir, Turkey,  October 27-29, 2011.

Akyol, D.E., De Koster, R.. Non-dominated Time-Window Policies in City Distribution, POMS 2011, Reno, Nevada, USA, April 4- May 2, 2011.

Altun, K., Dereli, T., Baykasoglu, A.. Usage of modified even-swaps in case of multi-bargainable-issue,FUZZYSS’11: 2nd International Fuzzy Systems Symposium. (ed., Gokceoglu C., Aladag HC., Akgun A) Hacettepe University, Cultural Center, November 17-18, 2011, Ankara, Turkey, pp. 87-91.

Altuntas, S., Dereli, T. & Selim, H.. A Fuzzy Weighted Association Rule Based Solution Approach to Facility Layout Problem. Proceedings of the Second International Fuzzy Systems Symposium (FUZZYSS’11), Ankara, Turkey, 2011, 133-137.

Baykasoğlu, A., Durmuşoğlu, Z.D.U.. Dynamic optimization in a dynamic and unpredictable world. 2011 Proceedings of PICMET ’11: Technology Management In The Energy-Smart World (PICMET), July 31-August 4, 2011, Hilton Portland and Executive Tower, Portland, Oregon, USA, pp. 2312-2319.

Baykasoğlu, A., Durmuşoğlu, Z.D.U., Görkemli, L.. Solving vehicle deployment planning problem by using agent based simulation modeling. 2nd International Symposium on Computing in Science & Engineering, June, 1-4, 2011, Gediz University Publications, editor: M. Gunes, ISBN:978-605-61394-2-0, pp.338-340, Kuşadası, Aydın, Turkey.

Baykasoglu, A., Ozbakir, L., Gorkemli, L., Gorkemli, B.. Multiple ant colony algorithm for balancing parallel assembly lines with fuzzy parameters. FUZZYSS’11: 2nd International Fuzzy Systems Symposium, (ed., Gokceoglu C., Aladag HC., Akgun A) Hacettepe University, Cultural Center, November 17-18, 2011, Ankara, Turkey, pp. 163-168.

Baykasoglu, A., Kaplanoglu, V., Durmusoglu, Z.D.U., Sahin, C.. A fuzzy TOPSIS approach to truck selection.FUZZYSS’11: 2nd International Fuzzy Systems Symposium, (ed., Gokceoglu C., Aladag HC., Akgun A) Hacettepe University, Cultural Center, November 17-18, 2011, Ankara, Turkey, pp. 142-145.

Demirkol Akyol, Ş., Bayhan, M.. A Particle Swarm Optimization Algorithm for Maximizing Production Rate and Workload Smoothness. Nature and Biologically Inspired Computing (NABIC11), 2011.

Demirtas, E.A., Ozsoydan, F.B., Determination of Optimal Product Styles by a New Genetic Algorithm for Kitchen Faucets. 12th International Symposium on Econometrics Operations Research and Statistics, 2011 Pamukkale University.

Elmi, A., Hamzadayı, A., Akpınar, S., Elmi, A.. A Tabu Search Approach for the Flow Shop Group Scheduling Problem. 4th International Conference of Iranian Operations Research Society, Rasht, Iran, May 2011.

Hamzadayı, A., Elmi, A., Akpınar, S., Elmi, A.. An Integer Linear Programming Model for Group Scheduling in Hybrid Flow Shops. 4th International Conference of Iranian Operations Research Society, Rasht, Iran, May 2011.

Kaplanoğlu, V., Baykasoğlu, A.. An agent-based order dispatching model for third party logistics service providers. International Logistics and Supply Chain Congress’ 2011, Izmir, Turkey, October 27-29, 2011.

Kulluk, S., Ozbakir, L., Baykasoglu, A.. Self-adaptive global best harmony search algorithm for training neural Networks. Procedia Computer Science, 3, 282-286, 2011.

Kulluk, S., Ozbakir, L., Baykasoglu, A.. Fuzzy DIFACONN-miner: A soft computing based approach for fuzzy rule extraction from artificial neural Networks. FUZZYSS’11: 2nd International Fuzzy Systems Symposium, (ed., Gokceoglu C., Aladag HC., Akgun A) Hacettepe University, Cultural Center, November 17-18, 2011, Ankara, Turkey, pp. 258-263.

Koltan, A., Bıçak, E., Güler, F., Özdağoğlu, G., Yalçınkaya, Ö., Şişmanoğlu, S., Atar, S., Çaylan, T.. EİM’lerin yeni yetki alanları ve ergonomic. VIII. Endüstri – İşletme Mühendisliği Kurultayı Bildiriler Kitabı, 72-74, Bursa, Türkiye, 2-3 Aralık 2011.

Ozsoydan, F.B., Sipahioglu, A.. A Discrete Particle Swarm Optimization Algorithm For The Capacitated P-Median Problem. 12th International Symposium on Econometrics Operations Research and Statistics, 2011 Pamukkale University

Ozsoydan, F.B., Sarac, T.. A Discrete Particle Swarm Optimization Algorithm for Bi-Criteria Warehouse Location Problem. 12th International Symposium on Econometrics Operations Research and Statistics, 2011 Pamukkale University

Sel, C, Bilgen, B..Application of Fix & Optimize Heuristic to The Production Allocation and Distribution Supply Chain Network Problem. IX. International Logistics and Supply Chain Congress,  İzmir, Turkey, 27-29 October, 2011

Sipahioglu, A., Ozsoydan, F.B.. A New Discrete Particle Swarm Optimization Design for the Multiple Depot Open Vehicle Routing Problem. IX. International Logistics & Supply Chain Congress, Yasar University, Izmir, Turkey, 2011.

Subulan, K., Tasan, A. S., Baykasoglu, A.. Modeling medium term planning problem in a closed-loop supply chain with remanufacturing option via fuzzy mixed-integer programming. FUZZYSS’11: 2nd International Fuzzy Systems Symposium. (ed., Gokceoglu C., Aladag HC., Akgun A) Hacettepe University, Cultural Center, November 17-18, 2011, Ankara, Turkey, pp. 332-339.

Subulan, K., Tasan, A.S.. Reverse logistics network design model for recycling and retreading process of used tires. IX. International Logistics & Supply Chain Congress, Cesme, Turkey, 27-29 October, 2011.

Subulan, K., Tasan, A.S.. Analyzing the Effects of Scrap, Rework, Random Machine Breakdowns and Partial Backordering on the Economic Production Quantity Model Using Taguchi Method. 41st International Conference on Computers and Industrial Engineering, pp. 1004-1009, Los Angeles, USA, 23-26 October, 2011.

Subulan, K., Saltabas, A., Tasan, A.S., Girgin, S.C.. Modelling and Analzing of a Construction Project Considering Resource Allocation through a Hybrid Methodology: Petri Nets and Fuzzy Rule Based Systems. 41st International Conference on Computers and Industrial Engineering, pp. 1045-1050, Los Angeles, USA, 23-26 October ,2011.

Subulan, K., Tasan, A.S..A Reverse Logistics Network Design Model for Lead/Acid Battery Recycling. Logistics Research Network Conference, Southampton, UK, 7-9 September, 2011.

Subulan, K., Cergibozan, C., Tasan, A.S..Warm-up period determination for a storage system simulation model focusing on material handling operations. 12. International Symposium on Econometrics, Statistics and Operations Research, Denizli, Turkey, 26-29 May,2011.

Subulan, K., Tasan, A.S..A Medium-Term Planning Model for a Lead/Acid Battery Closed-Loop Supply Chain.12. International Symposium on Econometrics, Statistics and Operations Research. Denizli, Turkey, 26-29 May, 2011.

Tapkan, P., Ozbakir, L., Baykasoglu, A.. A direct solution approach for fuzzy multi-objective generalized assignment problem by using bees algorithm and fuzzy ranking. FUZZYSS’11: 2nd International Fuzzy Systems Symposium. (ed., Gokceoglu C., Aladag HC., Akgun A) Hacettepe University, Cultural Center, November 17-18, 2011, Ankara, Turkey, pp. 116-123.

Topaloglu, S., Hamzadayi, A. & Kose, S. Y.. Nested simulated annealing approach to the multi-period vehicle routing problem of a retail distribution system. 9th International Logistics & Supply Chain Congress, Çeşme, İzmir, October, 2011.

Tuncel, G., Bıcak, E., Durmaz, E.D.. An Application of Fleet Assignment Model for a Sample of the Inter-City Bus Schedule. The 9th International Logistics & Supply Chain Congress, Çeşme, October,2011.

Yunusoğlu, M.G., Selim, H.. A Fuzzy Rule-Based Decision Support System for Stock Evaluation and Portfolio Construction: An Application to Istanbul Stock Exchange. Proceedings of the Second International Fuzzy Systems Symposium (FUZZYSS’11), Ankara, Turkey, 152-157, 2011.

 

National Conference Proceedings

 

Araz, C., Araz, O.U, Akyol, D.E.. Akış Tipi Open-End İplik Üretimi Yapan bir Tekstil Firmasında  Dinamik Çizelgeleme Uygulaması. YA/EM 2011, Sakarya,2011.

Baykasoğlu, A., Volaka, S., Uz, S., Tanker, Ç.. E-marka bakış açısıyla Türkiye’deki endüstri mühendisliği programlarının internet ortamında görünümü. XVI. Türkiye’de İnternet Konferansı.  Ege Üniversitesi Atatürk Kültür Merkezi, Konak, İzmir (internet ortamında yayınlanmış makale, http://inet-tr.org.tr/inetconf16/), 30 Kasım-2 Aralık, 2011.

Baykasoğlu, A., Durmuşoğlu, Z.D.U., Görkemli, L.. Etmen tabanlı benzetim: ANYLOGICTM yazılımı ve örnek bir uygulama. Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi, İzmir, 30 Eylül-01/02 Ekim, 2011, TMMOB Makina Mühendisleri Odası Yayın No: E/2011/559, pp. 197-204.

Kaplanoğlu, V., Şahin, C., Baykasoğlu, A., Erol, R.. Etmen tabanlı sistem tasarım yöntemi: PROMETHEUSTM.Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi, İzmir, 30 Eylül-01/02 Ekim, 2011, TMMOB Makina Mühendisleri Odası Yayın No: E/2011/559, pp. 185-194.

Kulluk, S., Özbakır, L., Baykasoğlu, A.. Yapay sinir ağlarının eşzamanlı eğitimi ve kural çıkarımı: DIFACONN-MINER. Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi. İzmir, 30 Eylül-01/02 Ekim 2011, TMMOB Makina Mühendisleri Odası Yayın No: E/2011/559, pp. 225-243.

Özbakır, L., Baykasoğlu, A.. Genetik programlamaya dayalı sınıflandırma yaklaşımı: MEPAR-MINER. Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi. İzmir, 30 Eylül-01/02 Ekim 2011, TMMOB Makina Mühendisleri Odası Yayın No: E/2011/559, pp. 211-222.

Şahin, C., Kaplanoğlu, V., Baykasoğlu, A., Erol, R.. Çoklu etmen geliştirme platformu: JACKTM. Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi. İzmir, 30 Eylül-01/02 Ekim 2011, TMMOB Makina Mühendisleri Odası Yayın No: E/2011/559, pp. 169-181.

Subulan, K., Tasan, A.S.. Akü üretiminde tersine lojistik faaliyetlerini dikkate alarak orta dönem planlama modelinin geliştirilmesi. Yöneylem Araştırması ve Endüstri Mühendisliği 31. Ulusal Kongresi. Sakarya, Türkiye, 5-7 Temmuz, 2011.

Tapkan, P., Özbakır, L., Baykasoğlu, A.. WEKA ile veri madenciliği süreci ve örnek uygulama. Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi. İzmir, 30 Eylül-01/02 Ekim 2011, TMMOB Makina Mühendisleri Odası Yayın No: E/2011/559, pp. 247-262.

Topaloglu,Ş., & Tunçel, G.. Bir Elektronik Firmasında Paralel İstasyon ve Atama Kısıtlı Montaj Hattı Dengeleme Çalışması. Endüstri Mühendisliği Yazılımları ve Uygulamaları Kongresi Bildiriler Kitabı, İzmir, s. 109-118., 2011.

 

Seminars, Presentations

 

Selim H., Seminer Konusu: Risk Yönetimi, Seminerin verildiği Kurum: Ege Bölgesi Sanayi Odası (EBSO), Seminer Tarihi: 03.02.2011

 

 

2010 Publications

 

International Journal Articles

 

Araz, Ö.U., and Salum, L., “A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems”, Int. J. Production Research, Vol. 48, pp. 251–270, 2010.

Armaneri, Ö., Özdağoğlu, G. and Yalçınkaya, Ö., “An integrated decision support approach for project investors in risky and uncertain environments”, Journal of Computational and Applied Mathematics, Vol. 234(8), pp. 2530-2542, 2010.

Bayhan, M., Önel K. “Optimization of Reinforcement Content and Sliding Distance for AISi7Mg/SiCp Composites Using Response Surface Methodology”, Materials and Design, Vol. 31, pp. 3015-3022, 2010.

Bilgen, B. “Application of Fuzzy Mathematical Programming Approach to the Production Allocation and Distribution Supply Chain Network Problem”, Expert Systems with Applications, Vol. 37, pp. 4488-4495, 2010.

Bilgen, B, Guenther, H. O. “Integrated Production and Distribution Planning in the Fast Moving Consumer Goods Industry: A Block Planning Application”. OR Spectrum, Vol. 32, pp. 917-955, 2010.

Bilgen, B., “Supply Chain Network Modeling in a Golf Club Industry via Fuzzy Linear Programming Approach”, Journal of Intelligent & Fuzzy Systems, Vol. 21, pp. 243-253, 2010.

Ilgin, M.A. and Gupta, S.M., “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art”, Journal of Environmental Management, Vol. 91, No. 3, pp. 563-591, 2010.

Ilgin, M.A. and Gupta, S.M., “Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-product Disassembly Line”, Computers & Industrial Engineering, Vol. 59, No. 4, pp. 748-763, 2010.

Kılınçcı, Ö. “A Petri Net-Based Heuristic for Simple Assembly Line Balancing Problem of Type 2”, International Journal of Advanced Manufacturing Technology, 46/1-4, pp. 329-338, 2010.

Topaloğlu, Ş. and Selim, H., “Nurse Scheduling Using Fuzzy Modeling Approach”, Fuzzy Sets and Systems, Vol. 161, pp. 1543-1563, 2010.

Özkarahan, İ. and Topaloğlu, Ş., “Integration of OR and AI: Medical Residency Scheduling Application”, Journal of Computers, Information Technology and Engineering, Vol. 4, pp. 1-17, 2010.

 

National Journal Articles

Armaneri, Ö., Yalçınkaya, Ö., “Belirsiz ve riskli ortamlarda yatırım projelerinin değerlendirilmesine yönelik benzetim tabanlı bir yaklaşım,” Anadolu Üniversitesi Bilim ve Teknoloji Dergisi – A Uygulamalı Bilimler ve Mühendislik, Vol. 11(1), pp. 1-16, 2010.

Yunusoğlu, M. G., Korkmaz, H., Selim, H., “Türkiye’deki İmalat İşletmelerinde Risk Farkındalığı ve Risk Yönetimi Uygulamalarına Bakış: Tedarik Zinciri Odaklı Bir Analiz”, Lojistik, Vol. 14, pp. 24-31, 2010.

 

International Conference Proceedings

 

Altuntaş, S., Selim, H., “Facility Layout Using Weighted Association Rule-Based Data Mining Algorithms: Evaluation with Simulation”, Proceedings of 1st International Symposium on Computing in Science & Engineering, pp. 655-663, Izmir, Turkey, June 2010.

Ilgin, M.A. and Gupta, S.M., “An Evaluation of the Effect of Sensor Embedded Products in Product Disassembly with Precedence Relationships”, Proceedings of the 2010 Northeast Decision Sciences Institute Conference, pp. 409-414, Alexandria, Virginia, USA, March 2010.

Ilgin, M.A. and Gupta, S.M., “Disassembly of Sensor Embedded Products with Component Discriminating Demand”, Proceedings of the 2010 Northeast Decision Sciences Institute Conference, pp. 427-432, Alexandria, Virginia, USA, March 2010.

Ilgin, M.A., Gupta, S.M. and Nakashima, K., “Design of Experiments to Evaluate the Impact of Sensor Embedded Products on EOL Processing”, Proceedings of the Ninth International Conference on EcoBalance, pp. B1-1430, Tokyo, Japan, November 2010.

Ilgin, M.A. and Gupta, S.M., “Use of Sensor Embedded Products for End of LifeProcessing”, Proceedings of the 2010 Winter Simulation Conference, pp. 1584-1591, Baltimore, Maryland, USA, December 2010.

Murakami K., Ozmehmet Tasan S., Tasan S., Gen M., Oyabu T., “A Genetic Algorithm Approach to Solving A Tourist-based Tour Guide Allocation Problem”, Japan-Korea Workshop on Production and Logistics Systems, Japan, March 2010.

Murakami K., Özmehmet Taşan S., Gen M., Oyabu T., “A Solution of Human Resource Allocation Problem in a Case of Hotel Management”, In Proc. of 40th International Conference on Computer & Industrial Engineering, Japan, July 2010.

Ozmehmet Tasan S., “Multiobjective Hybrid Genetic Algorithms for Assembly Line Balancing (Tutorial Talk)”, International Conference on Computers & Industrial Engineering, Japan, July 2010.

Ozmehmet Tasan S., Gen M., “An Integrated Selection and Scheduling for Large-sized Disjunctive Network Problems”, In Proc. of 40th International Conference on Computer & Industrial Engineering, Japan, July 2010.

Özel, G., Ünal, A. and Topaloğlu, Ş., “Improving Public Disabled Transportation Using a Mathematical Programming Approach”, 24th European Conference on Operational Research, Lisbon, Portugal, July 2010.

Yelkenci, S. and Tunalı, S., “A Hybrid Method Combining Genetic Algorithm and Simulation For Buffer Size Allocation In A Real Manufacturing System” 24th European Conference on Operational Research, Lisbon, Portugal, July 2010.

 

National Conference Proceedings

 

Akbakır, S., Kılınçcı, Ö., “TFT Televizyon Üretim Sürecindeki Hataların Giderilmesi”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

Akyol, D.E., De Koster, M.B.M. “Kentsel Yük Taşımacılığında Dağıtım Zaman Pencereleri Belirlenmesi”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

Bilgen, B., Durmaz, E. “Bulanık AHP Yöntemine Dayalı Karar Verme Yaklaşımı ile Dinamik Ortamda Tedarikçi Seçimi: Elektronik Endüstrisinde bir Uygulama”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

Çiçekdeş, B. ve Topaloğlu Ş. “Kapasiteli Araç Rotalama Problemi Vaka Çalışması: Bir Otomotiv Firmasının Günlük Dağıtım Problemi için Geliştirilen Genetik Algoritma Yaklaşımı”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

Özdemir, Ö. ve Topaloğlu, Ş., “A Hybrid Differential Evolution Based Algorithm for Parallel Machine Makespan Minimization Problem with Sequence Dependent Setup Times”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

Özdöl E., Yıldız, G., “Sıra Bağımlı Hazırlık Zamanlı Esnek Atölye Çizelgeleme Problemi: Genetik Algoritma ile Tamamlanma Zamanı Minimizasyonu”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

Subulan K., Çakmakçı M. “Optimizasyon ve Taguchi Yaklaşımı Kullanılarak Otomotiv Sanayiinde Taşıma ve Aktarma Sistemleri için Fizibilite Çalışması”, Proceedings of the 30th Operations Research and Industrial Engineering National Conference (30. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, İstanbul, Turkey, June 2010.

 

Other Publications

 

Ilgin, M.A., Book Review of “Environment Conscious Manufacturing” edited by Gupta, S. M. and Lambert, A. J. D. , International Journal of Production Research, Vol. 48, No.14, 4325-4326, 2010.

 

2009 Publications

 

International Journal Articles

Salum, L., and Araz, Ö.U., “Using the when/where rules in dual resource constrained systems for a hybrid push-pull control”, Int. J. Production Research, Vol. 47, pp. 1661–1677, 2009.

Selim H., “Determinants of house prices in Turkey: Hedonic regression versus artificial neural network”, Expert Systems with Applications (ISI), Vol. 36(2), pp. 2843-2852, 2009.

Topaloğlu, Ş. “A Shift Scheduling Model for Employees with Different Seniority Levels and an Application in Health Care”, European Journal of Operational Research, Vol. 198, pp. 943-957, 2009.

Özdağoğlu, G., and Salum, L., “Modern QFD-based requirements analysis for enterprise modelling: enterprise-QFD.”, Int. J. Computer Integrated Manufacturing, Vol. 22, pp. 1102–1127, 2009.

Yalçınkaya, Ö. and Bayhan G. M.,”Modelling and Optimization of Average Travel Time for a Metro Line by Simulation and Response Surface Methodology”, European Journal of Operational Research, Vol. 196, pp 225-233, 2009.

National Journal Articles

Özdağoğlu, A., Yalçınkaya, Ö., Özdağoğlu, G., “Ege Bölgesi’ndeki bir araştırma ve uygulama hastanesinin acil hasta verilerinin simüle edilerek analizi”, İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, Vol. 15, 2009.

 

International Conference Proceedings

 

Akyol, D.E., De Koster, M.B.M., “Non-Dominated Time-Window Policies in City Distribution.” 23rd European Conference on Operational Research, Bonn, Germany, 2009.

Demirkol S., Bayhan G. M., “Multi-Objective Evolutionary Meta-Heuristic Optimization” 23rd European Conference on Operational Research, pp. 273, Bonn, Germany, 2009.

  1. Bilgen, “A fuzzy programming approach for an integrated production and distribution problem with uncertain conditions”, European Conference on Operational Research 2009, pp. 123, Bonn, Germany July 2009.

Gen M., Özmehmet Taşan S., “Resource-Constrained Project Scheduling: Multiobjective Genetic Algorithm Approach (Tutorial Talk)”, In Proc. of International Conference on Computers & Industrial Engineering, France, July 2009.

Hirano K., Özmehmet Taşan S., Gen M., Oyabu T., “Hybrid Multistage Decision-based Genetic Algorithm for Tour Guide Scheduling Problem: Tour and Tour Guide”, In Proc. of International Conference on Intelligent Manufacturing & Logistics Systems, Japan, February 2009.

Ilgin, M.A. and Gupta, S.M., “Analysis of a Kanban Controlled Disassembly Line with Sensor Embedded Products”, Proceedings of the 2009 Northeast Decision Sciences Institute Conference, Mohegan Sun, Uncasville, Connecticut, USA, pp. 555-560, April 2009.

Ilgin, M.A. and Gupta, S.M., “The Effect of Disassembly Process on Spare Parts Inventory Management in Post Product Life Cycle”, Proceedings of the 2009 Northeast Decision Sciences Institute Conference, Mohegan Sun, Uncasville, Connecticut, USA, pp. 561-566, April 2009.

Murakami K., Ozmehmet Tasan S., Tasan S., Gen M., Oyabu T., Yang Y., “Applying Metaheuristic Approach to Three-dimensional Tour Guide Allocation Problem”, Artificial Neural Networks in Engineering Conference ANNIE 2009, Intelligent Engineering Systems Through Artificial Neural Networks, Vol. 19, pp. 291-298, USA, November 2009.

Okada I., Özmehmet Taşan S., Gen M., “Random Key-Based Genetic Algorithm Approach for Solving Bi-objective rc-PSP/mM While Smoothing Resource Usage”, In Proc. of Symposium on Group Technology and Cellular Manufacturing, Japan, February 2009.

Özkarahan, İ. and Topaloğlu, Ş., “Integration of OR and AI: Medical Residency Scheduling Application”, Proc. 10th International Meeting of Decision Sciences Institute, Nancy, France, June 2009.

Özmehmet Taşan S., Gen M., “Optimizing Cost Associated Multiobjective Resource-constrained Project Scheduling Problems”, In Proc. of Workshop on Manufacturing & Logistics Information Systems, Japan, February 2009.

Özmehmet Taşan S., Gen M., “A Metaheuristic-based Approach to Investigate the Trade-offs between Discrete Time and Indirect Cost in Resource-constrained Project Scheduling Problems”, In Proc. of Symposium on Group Technology and Cellular Manufacturing, Japan, February 2009.

Topaloğlu, Ş., “Constraint Programming for Solving the Complex-Constrained Assembly Line Balancing Problem”, 23rd European Conference on Operations Research, Bonn, Germany, July 2009.

Volling, T., Akyol, D.E., Wittek, K., Spengler, T., “A dynamic approach to bid-price-based revenue management in make-to-order production.” POMS 2009, Orlando, USA, 2009.

Wittek, K., Akyol, D.E., Spengler, T., Volling, T. “A Dynamic Bid-Price Approach to Reduce Risk in Make-to-Order Revenue Management”, 23rd European Conference on Operational Research, Bonn, Germany, 2009.

 

National Conference Proceedings

Çalışkan A., Kılınçcı Ö., “Using the Extended Value Stream Mapping Tool in Lean Six Sigma Methodologies for Lean Supply Chains”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Çiçekdeş, B. and Topaloğlu Ş., “Kapasiteli Araç Rotalama Problemi Üzerine Bir Vaka Çalışması: Bir Otomotiv Firmasının Günlük Dağıtım Problemi için Matematiksel Bir Model”, 9th National Production Research Symposium (9. Ulusal Üretim Araştırmaları Sempozyumu), Eskişehir, Turkey, October 2009.

Edis, E. B., Durdu, M., Selim, H. “Uluslararası Bir Gıda Firmasında Üretim Programlarının Oluşturulması: Çok Amaçlı Bir Tamsayılı Programlama Modeli”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Elyorgun Akkiraz, G.,  Akkavak, Ö., Yalçınkaya, Ö., “Endüstri mühendisliği stratejik plan hazırlık sürecinin neresinde? İzmir Büyükşehir Belediyesi vakası”, VII. Endüstri – İşletme Mühendisliği Kurultayı Bildiriler CD’si, Sakarya, Turkey, 20-21 Kasım 2009.

Hamzadayı, A., Topaloğlu Ş. and Özdemir Ö., “Portföy Seçiminde Genetik Algoritma ile Bulanık Hedef Programlama”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Korkut, A. Topaloğlu Ş. and Çavuş V., “Tavukçuluk Sektöründe Yer Alan Bir Firmada Bütünleşik Pazarlama ve Üretim Faaliyetleri için Önerilen Matematiksel Programlama Yaklaşımı”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Özfırat P.M., Bilgen B., “Bir Tersine Lojistik Ağ Tasarımı Modeli: Matematiksel Programlama Yaklaşımı”, National Production Research Symposium (Ulusal Üretim Araştırmaları Sempozyumu), pp. 463-469, Istanbul, Turkey, 2009.

Özdemir, Ö., Topaloğlu Ş., “An Effective Hybrid Differential Evolution Based Algorithm for the Single Machine Makespan Minimization Problem with Sequence-Dependent Setup Times”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Şahin M., Selim H., “Bankaların Mali Performanslarının Değerlendirilmesi: Türk Bankacılık Sektöründe Bir Uygulama”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Yelkenci, S. and Tunalı S., “Eşanjör Üretim Hattında Simülasyon Kullanılarak Darboğaz İstasyonların Belirlenmesi” Proceedings of the 10th Econometrics and Statistics National Symposium, Erzurum, Turkey, May 2009.

Yelkenci, S., Vupa Ö., Kuruoğlu E. and Güven H., “Lise Öğrencilerinin Ağız-Diş Sağlığı Değerlendirmesinde Lojistik Regresyon Yaklaşımı” Proceedings of the 10th Econometrics and Statistics National Symposium, Erzurum, Turkey, May 2009.

Yeşilyaprak E., Yıldız, G., “İki Ölçütlü Dinamik Tek Makine Çizelgeleme Problemine Q-Öğrenme Algoritması Tabanlı Bir Yaklaşım”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Yıldırım, O., Topaloğlu Ş. and Ihlamur M., “Yalın Yaklaşım ile Pehlivanoğlu Market Zincirinde Stok Yönetimi”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Yılmaz, Ş., Burnak, N., “Yüksek Kaliteli Süreçlerde Shewhart Kontrol Grafiklerinin Kullanımındaki Uygunsuzluklar ve Birikimli Hatasız Ürün Sayısı Kontrol Grafiği Kullanımı”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

Yunusoğlu, M. G., Korkmaz, H., Selim, H., “İşletmelerde risk farkındalığı ve risk yönetimi uygulamalarına bakış: Türkiye’deki imalat sektörü üzerine bir değerlendirme”, Proceedings of the 29th Operations Research and Industrial Engineering National Conference (29. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Ankara, Turkey, June 2009.

 

2008 Publications

International Journal Articles


Akyol, D.E., Bayhan,G.M. “Multi-Machine Earliness and Tardiness Scheduling Problem: An Interconnected Neural Network Approach.” International Journal of Advanced Manufacturing Technology, Vol. 37, pp. 576-588, 2008.

Bilgen, B., “Modeling of A Blending and Marine Transportation Planning Problem with Fuzzy Mixed-Integer Programming”. International Journal of Advanced Manufacturing Technology, Vol. 36, pp. 1041-1050, 2008.

Kilincci, O., Bayhan, G. M. “A P-Invariant-Based Algorithm for Simple Assembly Line Balancing Problem of Type-1”, International Journal of Advanced Manufacturing Technology, Vol. 37, No 3-4, pp. 400-409, 2008.

Salum, L., “Petri Nets and Time Modelling”, International Journal of Advanced Manufacturing Technology, Vol. 38, pp. 377–382, 2008.

Selim, H., Araz, C., Ozkarahan, I., “Collaborative Production-Distribution Planning in Supply Chain: Fuzzy Goal Programming Approach”, Transportation Research Part E: Logistics and Transportation Review (ISI), Vol. 44(3), pp. 396-419, 2008.

Selim, H., Ozkarahan, I., “A Supply Chain Distribution Network Design Model: An Interactive Fuzzy Goal Programming-Based Solution Approach”, International Journal of Advanced Manufacturing Technology (ISI), Vol. 36(3-4), pp. 401-418, 2008.

Özmehmet Taşan S., Tunalı S., “A Review of the Current Applications of Genetic Algorithms in Assembly Line Balancing”, Journal of Intelligent Manufacturing, Vol. 19(1), pp. 44-69, 2008.

Yildiz, G., Tunali, S. “Response Surface Methodology Based Simulation Optimization of a CONWIP Controlled Dual Resource Constrained System”, International Journal of Advanced Manufacturing Technology, Vol. 36, No:11-12, pp.1051-1060, 2008.

National Journal Articles

Armaneri, Ö., Özdağoğlu, G. and Yalçınkaya, Ö., “Proje risk düzeyinin belirlenmesi için simülasyonu ve bulanık kümeler teorisini temel alan bütünleşik bir yaklaşım”, Anadolu Üniversitesi Bilim ve Teknoloji Dergisi, Vol. 9(2), pp. 223-239, 2008.

Oruç, K.E., Armaneri, Ö. and Yalçınkaya, Ö., “360 derece performans değerleme ve web tabanlı bir model ile kurumsal verimliliğin arttırılması”, Endüstri Mühendisliği Dergisi, Vol. 19(1), pp. 4-18, 2008.

 

International Conference Proceedings

 

Akpınar, Ş., Karaoğlan, A. D., and Bayhan, G. M. “Petri Net-Aided Scheduling of Manufacturing Systems: A Comparison”, Proceedings of 6th International Symposium on Intelligent and Manufacturing Systems, October 2008.

Bilgen B., Günther H. O., “A Mixed-Integer Linear Programming Model for Production and Distribution in Consumer Goods Supply Chain”, Proceedings of the Operations Research Conference 2008, Selected Papers of the Annual International Conference of the German Operations Research Society, Springer, September 3-5, Augsburg, Germany, 2008.

Demirkol, S. and Bayhan, G. M. “ARL Performances of Control Charts or Autocorrelated Data”, Proceedings of the 38th International Conference on Computers and Industrial Engineering, pp. 400-408, Beijing, China, 2008.

Esmer, S., Yildiz, G. Tuna O. “Modelling Ship Berthing at IZMIR Port Container Terminal Through Simulation Method”, International Association of Maritime Economists (IAME) Annual Conference, Dalian, China, April 2008.

Gen M., Özmehmet Taşan S., Hirano K., “Hotel Management Model: Human Resource Allocation by Evolutionary Algorithms (Tutorial Talk)”,Joint Conference of Korean Institute of Industrial Engineers and Korean Operations Research and Management Science Society, South Korean, May, 2008.

Hirano K., Özmehmet Taşan S., Gen M, Oyabu T., “Optimization of Multistage Staffing Decisions by Genetic Algorithms”, Workshop on Manufacturing & Logistics Information Systems, Japan, February, 2008.

Hirano K., Özmehmet Taşan S., Gen M., Oyabu T., “Hybrid Multiobjective Genetic Algorithm for Allocation Problem with Human Resource Motivation”, In Proc. of ANNIE (Artificial Neural Networks in Engineering) Conferences, USA, November 2008.

Hirano K., Özmehmet Taşan S., Gen M., Oyabu T., “Leveling of Resources in Staff Scheduling Problem Based on Hybrid Genetic Algorithm”, Proc. of the Seventh International Conference on Information and Management Sciences, China, August, 2008.

Hirano K., Özmehmet Taşan S., Gen M., Oyabu T., “Skill-based Resource Allocation Problem by Multistage Decision-based Genetic Algorithm”, Asia Conference on Intelligent Manufacturing & Logistics Systems, Japan, February, 2008.

Ilgin, M.A. and Gupta, S.M., “Using Simulation Optimization for Parts Recovery and Spare Parts Inventory Management in Post Product Life Cycle”, Proceedings of the 2008 Northeast Decision Sciences Institute Conference (CD-ROM), pp. 543-545, Brooklyn, New York, USA, March 2008.

Ilgin, M.A. and Gupta, S.M., “Joint Optimization of Transportation and Spare Parts Inventory Policies in a Reverse Logistics Network Using OptQuest”, Proceedings of the 2008 ASME International Mechanical Engineering Congress and Exposition, pp. 877-885, Boston, Massachusetts, USA, October 2008.

Minsung S., Wenqiang Z., Özmehmet Taşan S., “Multiobjective Analysis of Assembly Line Balancing by Using Priority-based Genetic Algorithm”, Asia Conference on Intelligent Manufacturing & Logistics Systems, Japan, February, 2008.

Spengler, T., Volling, T., Wittek, K., Akyol, D.E. “Dynamic Bid Price Policies for MTO Revenue Management” Proceedings of the Operations Research Conference 2008, Selected Papers of the Annual International Conference of the German Operations Research Society, Springer, September 3-5, Augsburg, Germany, 2008.

Topaloğlu, Ş., “A Mathematical Programming Based Approach to Integrated Production Planning and Scheduling of Manufacturing Systems with Work Cells: A Case Study in Textile Industry”, Proc. 6th International Symposium on Intelligent and Manufacturing Systems, Sakarya, October 2008.

Topaloğlu, Ş. and G. Kılınçlı, “A New Bottleneck-Based Heuristic for Reentrant Job Shops: A Case Study in a Textile Factory,” Operations Research Proceedings 2008, Selected Papers of the Annual International Conference of the German Operations Research Society (GOR), Augsburg, Germany, September 2008.

Okada I., Özmehmet Taşan S., Gen M., “Optimization of Bi-objective Resource-constrained Project Schedules with Multiple Modes and Smoothing Resource Usage”, In Proc. of the Seventh International Conference on Information and Management Sciences, China, August, 2008.

Okada I., Özmehmet Taşan S., Gen M., “Random Key-based Genetic Algorithm for Solving Resource Constrained Project Scheduling Problem with Multiple Modes”, In Proc. of ANNIE (Artificial Neural Networks in Engineering) Conferences, USA, November 2008.

Okada I., Özmehmet Taşan S., Gen M., “Random Key-Based Genetic Algorithm for Solving Bi-Objective Resource Constrained Project Scheduling Problem While Smoothing Resource Usage”, Asia Conference on Intelligent Manufacturing & Logistics Systems, Japan, February, 2008.

Okada I., Özmehmet Taşan S., “Solving Resource-constrainted Project Scheduling Problems for Reduction of construction Period and Efficient Usage of Resources Using Hybrid GA”, Workshop on Improvement Techniques of the Society of Plant Engineers Japan (SOPEJ), Japan, September, 2008.

Okada I., Özmehmet Tasan S., “Hybrid GA for Solving Project Scheduling and Resource Utilization by Shortening the Construction Period in Construction Projects”, Workshop on Manufacturing & Logistics Information Systems, Japan, February 2008.

Özmehmet Taşan S., “Assembly Line Balancing System and Metaheuristic Techniques”, Workshop on Ubiquitous Intelligent Computing and Applications to Decision Making, Japan, February, 2008.

Özmehmet Taşan S., “A Monolithic Genetic Algorithm Approach for Alternative Project Selection and Project Scheduling in Resource Constrained Multiple Project Environments”, In Workshop on Improvement Techniques of the Society of Plant Engineers Japan (SOPEJ), Japan, September, 2008.

Özmehmet Taşan S., Gen M., “Solving combined alternative project selection and resource constrained multiple project scheduling problems by using a genetic algorithm approach”, Workshop on Manufacturing & Logistics Information Systems, Japan, February, 2008.

Özmehmet Taşan S., Gen M., “A Resource Constrained Project Scheduling Problem with Discounted Cash Flows: A Genetic Algorithm Approach”, In Proc. of the Seventh International Conference on Information and Management Sciences, China, August, 2008.

Özmehmet Taşan S., Gen M, “A Priority-based Genetic Algorithm Approach for Solving Multiple Alternative Project Scheduling Problems with Resource Constraints and Variable Activity Times”, In Proc. of IEEE International Conference on Systems, Man, and Cybernetics. Singapore, October, 2008.

Özmehmet Taşan S., Gen M., “A Multistage Genetic Algorithm Approach for Solving Resource Constrained Multiple Project Scheduling Problems with Alternative Projects”, In Proc. of ANNIE (Artificial Neural Networks in Engineering) Conferences, USA, November 2008.

Özmehmet Taşan S., Gen M., “Resource-constrained Project Scheduling with Positive and Negative Cash Flows”, In Proc. of Asia-Korea Conf. On Advanced Science & Technology 2008, Japan, October 2008.

Özmehmet Taşan S., Gen M., “Solving Resource Constrained Multiple Alternative Project Scheduling Problems with Time and Resource Based Objectives”, Joint Conference of Korean Institute of Industrial Engineers and Korean Operations Research and Management Science Society, South Korean, May, 2008.

Özmehmet Taşan S., Gen M., “A Monolithic Genetic Algorithm Approach for Alternative Project Selection and Project Scheduling in Resource Constrained Multiple Project Environments”, Asia Conference on Intelligent Manufacturing & Logistics Systems, Japan, February, 2008.

Yalçınkaya, Ö., Bayhan, G.M., “Average travel time optimization for a metro line by simulation and response surface methodology”, In Proceedings of the 2nd International Railway Symposium & Railway Trade Exhibition, pp. 1361-1371, İstanbul, Turkey, 15-17 October 2008.

 

National Conference Proceedings

 

Iris, Ç., Kılınçcı, Ö. “Comparison of Storage Allocation Policies via Simulation”, Proceedings of the 28th Operations Research and Industrial Engineering National Conference (28. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Istanbul, Turkey, June 2008.

Kılınçcı, Ö., Önal, S. A. “Çamaşır Makinası Üreten bir Firma için Bulanık AHP ile Tedarikçi Seçimi”, Proceedings of the 28th Operations Research and Industrial Engineering National Conference (28. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Istanbul, Turkey, June 2008.

Selim, H., Eroğlu, S., Selim, S. “Uluslararası Bir Gıda Firmasında Müşteri Ilişkileri Yönetimi Uygulaması Kapsamında Müşteri Memnuniyet Düzeyini Etkileyen Faktörlerin Belirlenmesi”, Proceedings of the 28th Operations Research and Industrial Engineering National Conference (28. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Istanbul, Turkey, June 2008.

Topaloğlu, Ş. and Karakaya, E. “Bulanık Hedef Programlama ile Portföy Seçimi ve İMKB Üzerine Bir Uygulama”, Proceedings of the 28th Operations Research and Industrial Engineering National Conference (28. Ulusal Yöneylem Araştırması ve Endüstri Mühendisliği Konferansı Bildiri Kitabı), CD-ROM, Istanbul, Turkey, June 2008.